Andover - Emergency Ram-Raid Response & Temporary Security Works
Andover, Hampshire

The Brief
T&D Design and Build were contacted following a ram-raid incident at a client branch in Andover which had caused significant damage to the building frontage and left the premises exposed.
The priority was to respond immediately, make the affected area safe, assess the condition of the building and secure the branch as quickly as possible, whilst keeping operational disruption to an absolute minimum.
Given the extent of the impact, structural input was also required before temporary works could be completed and the branch safely returned to use.
Our Solution
T&D mobilised immediately and delivered the complete emergency response package, including:
- Attended site as an emergency response following notification of the incident.
- Coordinated Structural Engineer attendance to inspect the affected frontage and confirm the building could be safely secured.
- Cleared and removed broken materials, debris and damaged components from both the internal and external areas.
- Cleaned the affected branch area to allow temporary reinstatement works to proceed safely.
- Made the damaged frontage safe following the structural assessment.
- Designed and constructed a secure, insulated temporary hoarding system to fully enclose the damaged section of the building.
- Sealed and finished the temporary works to provide suitable weather protection and maintain the internal environment.
- Coordinated the works around the operational requirements of the branch to minimise downtime.
- Completed final checks and left the premises clean, secure and ready to reopen.
Result
Despite the significant damage caused by the incident, the branch was made safe, secured and reopened the following day.
Immediate mobilisation, close coordination between our site team, project management and Structural Engineer, and the ability to manage the entire response through a single contractor allowed the client to return to normal operations with minimal disruption.
The insulated temporary frontage provides a secure and weather-resistant solution while the permanent reinstatement works are developed.
A great example of the importance of a responsive supply chain when unexpected incidents occur — from the initial emergency attendance and structural assessment through to clearance, temporary works and reopening the building.