Whittlesey - Emergency Ram-Raid Response & Temporary Works
Whittlesey, Cambridgeshire

The Brief
T&D Group received an urgent call following a ram-raid at our client’s branch in Whittlesey, which had caused significant damage to the front of the property.
With the building left exposed and the branch unable to operate normally, the priority was to respond immediately, assess the damage, make the structure safe and secure the premises while keeping disruption to the client to an absolute minimum.
Our Solution
The T&D team mobilised to site immediately following the call.
Following the initial assessment, all damaged materials, glazing and debris were carefully cleared from the affected area to provide a safe working environment and allow the extent of the damage to be properly assessed.
Due to the nature of the impact and damage to the building frontage, T&D also coordinated Structural Engineer support to confirm the appropriate temporary measures required. Temporary propping was subsequently installed to ensure the affected structure remained suitably supported.
With the building made safe, our team constructed secure temporary hoarding across the damaged frontage. The hoarding was then decorated to provide a clean and professional appearance while permanent reinstatement works could be progressed.
The works included:
- Immediate emergency attendance and site assessment
- Clearance and removal of damaged materials and debris
- Coordination with the Structural Engineer
- Installation of temporary structural propping
- Construction of secure temporary hoarding
- Decoration of the temporary frontage
- Site clearance and preparation for the branch to reopen
Result
From our initial attendance, the damaged area was made safe, structurally supported, cleared, securely hoarded and left presentable within 24 hours, allowing the branch to reopen with minimal disruption.
The project required rapid coordination between our site team, project management and Structural Engineer, with everyone working together to turn an emergency situation into a safe and controlled environment in an extremely short timeframe.
A fantastic effort from everyone involved and a great example of T&D Group’s reactive maintenance capability, combining a fast response with the technical support, trades and project management required to manage the complete package.
When an emergency happens, speed matters, but it still has to be done safely and properly.